ASSIGNMENTS:
Pressure and Position Monitoring and Timing Analysis of a
Pneumatic Engine. OR
Control of the Bosch Conveyor System
LAB SUMMARY OF ACTIVITIES (TENTATIVE SCHEDULE) |
Lab Number | Lab Identification | Lab Name | Grade |
1 | Lab 1 | Alarm System | |
2 | Lab 2A | Pneumatic Can Crusher | |
3 | Lab 2B | Parts Tracking: Shift Register | |
4 | Lab 3 | Stepper Motor Control | |
5 | Lab 5 | Automated Measuring Station | |
6 | Lab 6 | Automated Drilling Station
(Automation Studio) |
|
7 | Lab 7 | SFC Programming
(Automation Studio) |
|
8 | Lab 8 | LabView Exercises (TBA) | |
9 | Lab 9 | Fluid Processing Monitoring | |
10 | Lab 10 | LabView Control of
Robot OR Instrumentation |
|
11-12 | Mini-Project | Pneumatic Engine OR Automated Conveyor System |